Stand Drive Method
New proposal for "rock bolt work and rebar insertion work"! Construction is possible if the distance between the slope and interfering objects such as houses is 2.0 to 3.0 meters.
This technology is a method that allows for the installation of rock bolts without scaffolding. Due to the characteristic of erecting the drilling machine with wires, the drilling machine itself is lightweight, eliminating the need for cranes or scaffolding for relocation or installation. As a result, it is possible to perform inter-tree drilling in the forest without cutting down surrounding trees. Additionally, since drilling can be done without deforestation, it is highly compatible with environmentally friendly slope construction. 【Features】 ■ No scaffolding required at all ■ No need for tree cutting even in inter-tree construction ■ Reduces traffic restrictions in urban construction ■ Environmentally conscious with dust control measures ■ Numerous construction achievements *For more details, please refer to the PDF materials or feel free to contact us.
- Company:大翔
- Price:Other